Fascination About Termite Control Maintenance

The 5-Minute Rule for Termite Control MachineThe Buzz on Termite Control Machine

Facts About Termite Control Liquid Or Bait Revealed


Having a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There may be other termite nests nearby the building that do not find the bait stations. Your house is a much larger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring properties. .

The Sentricon baits are put in their in-ground lure stations after removal of the infested lumber therein. This may involve sufficient disruption of the termites such that they avoid the in-ground Sentricon bait station, entirely.

This serious short-coming is overcome by the patented Exterra Termite Stations where the timber is aligned around the cylinder such that the lure can be inserted without such disturbance of the termites present.

RECOMMENDATION: Exterra or Sentricon be used where a complete chemical soil barrier treatment using Termidor or Premise is not practicable or desired, and in which a few thousand termites will likely eat the bait.

Termite Control Machine for Dummies


A termite monitoring and baiting software can be integrated with a range of methods including (1) drilling susceptible trees and eradication of any termite nest situated therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is usually associated with a readily available timber food and moisture supply nearby the central nest. In addition, buildings are often constructed in a manner that allow termites to gain undetectable entry in the soil to the structural timbers of this building. Listed below are some useful recommendations for the house owner to execute in order to reduce the possibility of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the base of this building and sub-floor area (if any). Water run-off can be excluded in the sub floor region by the installation of ag-drains. Make sure there is adequate cross flow ventilation in the sub-floor area. more helpful hints In addition, a skilled plumber should be engaged to ensure there's no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit overflow.

A Biased View of Termite Control Maintenance


Please note: high humidity, dampness or moisture accumulating in a wall cavity is of high risk to encouraging large scale termite activity inside the building. .

Removal of any wood in contact with the soil. Timbers should be stored above ground to permit full inspection of subterranean termite activity (coming out of the soil thereunder). Any landscaping using wood chip mulch and railroad sleepers must definitely be removed, as they supply ready food source to help in rapid termite colony development. .

Ensure inspection access is unimpeded, especially in sub-floor areas (suspended flooring ) in order to search for evidence of termite activity. If your property is on a concrete slab on ground flooring, be sure that you can inspect the entire external slab border for evidence of termite mud-shelter tubes. Do NOT allow this region to be covered by openings, landscaping, planter pots, etcas termites often gain entry into the walls of a building through this locality, especially through external weep holes and minute (2 mm) gaps in the mortar in brick-work. .

8 Easy Facts About Termite Control Maintenance Described


Should you find live termites or termite damaged timbers DO NOT disturb the area. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites are special info likely to move everywhere, and might not be rediscovered until further evident damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait right to the live termites present in an attempt to eliminate the entire termite colony - as mentioned in detail above. .

Consumer Note: the installation of a find chemical soil barrier does not negate the need for routine competent inspections - at least 3 to 6 months where the termite risk is elevated.

A Biased View of Termite Control MaintenanceAn Unbiased View of Termite Control Liquid Or Bait
We recommend 3 or 6 monthly inspections have been carried for the first 2 years after a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the right identification of harmful termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires expert skill and judgement depending upon professional training and extensive field-work experience in termite control in a vast array of circumstances.

The 4-Minute Rule for Termite Control Liquid Or Bait


Termites, also known as white ants, are small soft bodied insects about half the size of a match-head. It is estimated that they cause more damage to homes in Australia than from fire, floods and storms combined. The harm is so good that termite damage is not covered by insurance meaning its a problem you need to keep on top of with Termite Pest Control.

Leave a Reply

Your email address will not be published. Required fields are marked *